Bay Area Images

The Fairmont Hotel located in downtown San Francisco
San Francisco
San Francisco County

Air District Fact

Compliance Assistance Hotline - (415) 749-4999 - The Bay Area Air Quality Management District Compliance Assistance Hotline provides businesses with valuable assistance in understanding and complying with air quality regulations. A call to the Hotline connects you to a compliance specialist who will get you the answers you need quickly and efficiently. The specialist will answer questions about compliance for your particular operation, including applicable regulations, record keeping, permitting and more. If you need additional technical assistance, a Courtesy Site Visit by a technical advisor can be arranged.

Give Us Your Feedback



select


(500 character limit)
 

I would like a response.
(Allow 5-7 business days)
 

 

Utility Buttons

  • Email This Page
  • Print
  •  Save & Share Share

BAAQMD Webcasts

Upcoming Webcasts

Workshop on Proposed Amendments to Regulation 2: Permits to be Webcast live from 10:00am to 12:00pm on 2/22/2012.
More Information:
Workshop Notice
(521 k PDF, 5 pgs)
Rule Workshops

Recent Webcasts

The Particulate Matter Workshop is available as a Webcast archive.
Meeting Presentation:
Reducing Particulate Matter in the SF Bay Area
(4 MB PDF, 49 pgs)
More Information:
Particulate Matter Planning

12/14/2011 Board of Directors Special Meeting
More Information:
12/14/2011 Agenda
(545 k PDF, 23 pgs)
Board Archives:
Agendas, Minutes and Media

HelpWebcast Support
System & player requirements, RSS feeds & mobile alternatives.

BAAQMD on iTunes

iTunes Audio Podcasts
iTunes Video Podcasts

Contacts

Groups

Compliance Assistance

415 749 4999


Full BAAQMD Directory

Flare Minimization at Bay Area Refineries

Regulation 12 Rule 12 Overview

Emissions from flaring at petroleum refineries have been an ongoing concern to the Bay Area Air Quality Management District and residents of the communities in the neighborhoods surrounding the refineries. Because flares are first and foremost safety devices that must be available for use in emergencies to prevent accident, hazard or release of refinery gas directly to the atmosphere, development of an appropriate regulatory mechanism to address flaring emissions has been a challenge.

Regulation 12, Rule 12 seeks to reduce emissions from flares at petroleum refineries by minimizing the frequency and magnitude of flaring. It prohibits the non-emergency use of a refinery flare unless that use is consistent with an approved flare minimization plan (“FMP” or “Plan”). The rule is structured to capture reductions previously realized by the refineries, and requires refiners to identify and implement all feasible prevention measures to further minimize flaring. In addition to the requirement to develop and implement minimization plans, the rule requires:

  • Timely notification to the District when significant flaring occurs;
  • Preparation and reporting of causal analyses by refineries when flaring occurs;
  • Monitoring and recording of pressure and water levels in refinery flare water seals; and
  • Annual updates to the FMPs to ensure continuous improvement in efforts to reduce flaring.

Flare Minimization Plans

Each refinery was required to develop an FMP that implements all measures available to reduce the frequency and magnitude of flaring events (“prevention measures”). Prevention measures were required to address flaring as a result of planned major maintenance, including startup and shutdown; flaring that may reasonably be expected to occur due to issues of vent gas quality or quantity; and flaring caused by the recurrent failure of air pollution control equipment, process equipment, or processes. Under Regulation 12-12, each FMP includes:

  • Basic information regarding the design and operation of the facility as it relates to flaring;
  • A description of the prevention measures previously taken or currently planned to reduce flare emissions at the refinery; and
  • Commitments to implement all additional feasible prevention measures expeditiously.

The District approved all five Bay Area refinery FMPs following substantial input from the public and only after it was determined that all available flaring prevention measures have been implemented or scheduled for expeditious implementation. All commitments under these plans are enforceable regulatory requirements. Since rule adoption in 2005, a substantial reduction in flare emissions in the Bay Area has resulted.

Public comments and approved initial FMPs are provided in the following table.

Note: These are redacted versions of the FMPs and confidential trade secret information has been removed.

Last Updated: 10/4/2010