Bay Area Images

Oakland Airport
Oakland
Alameda County

The Oakland Airport energy system, activated in fall 2007, delivers approximately 1 million kilowatt hours of clean renewable energy annually in support of the airport operation. This installation will contribute to the Port of Oakland's (owner/operator of OAK) continuing commitment to obtain 20% of its electricity from renewable sources.

Give Us Your Feedback



select


(500 character limit)
 

I would like a response.
(Allow 5-7 business days)
 

 

Utility Buttons

  • Email This Page
  • Print
  •  Save & Share Share

Spare the Air Status

Spare the Air Suns

City of Suisun CIty

The District is conducting a 30-day Public Comment period to comply with District regulations and State law (Waters Bill) for City of Suisun City's proposed project (Permit Application Number 20563) to install a Stationary Emergency Diesel Engine Powered Generator in Suisun City, CA.
DatePlant NumberApplication NumberDocuments
6/11/2009B964720563Engineering Evaluation (309 k PDF, 7 pgs)
6/11/2009B964720563Public Notice(47 k PDF, 2 pgs)
6/11/2009N/A20563Health Risk Screening Analysis(39 k PDF, 2 pgs)
Last updated: 2/28/2010