Flare

BAAQMD Refinery Flare Emission Report
Report Settings
Tesoro Martinez - Main Refinery
Download CSV
February - 2015
Date Vent Gas Flow Methane NMHC Sulfur Dioxide
(mo/day/yr) (volume in scf) See note **** (lbs) (lbs) (lbs)
2/1/2015 105,202.00 8.23 1.18 47.01
2/2/2015 6,866,507.00 958.32 2,321.66 4,934.19
2/3/2015 13,932,080.00 4,573.19 4,663.25 15,488.03
2/4/2015 6,880,660.00 3,223.31 1,556.77 14,985.35
2/5/2015 4,270,152.00 2,282.86 1,113.39 759.13
2/6/2015 3,376,568.00 1,962.43 1,247.57 267.51
2/7/2015 2,099,726.00 1,024.90 1,332.16 73.52
2/8/2015 2,189,630.00 1,082.84 1,324.59 152.38
2/9/2015 2,222,659.00 1,052.29 1,355.47 178.61
2/10/2015 1,224,971.00 619.52 722.63 251.95
2/11/2015 888,371.00 443.58 568.89 140.65
2/12/2015 1,528,954.00 751.55 1,067.97 108.25
2/13/2015 862,333.00 435.33 553.65 122.23
2/14/2015 895,455.00 457.65 572.39 121.15
2/15/2015 842,996.00 446.28 514.92 105.58
2/16/2015 1,242,431.00 622.33 824.69 57.19
2/17/2015 1,463,483.00 752.33 833.76 74.50
2/18/2015 1,706,216.00 953.40 849.27 86.41
2/19/2015 1,926,867.00 1,094.20 896.18 87.28
2/20/2015 1,335,766.00 710.01 814.94 87.13
2/21/2015 1,275,808.00 731.01 701.09 76.28
2/22/2015 1,218,376.00 664.45 773.77 76.96
2/23/2015 1,249,679.00 679.01 844.09 48.34
2/24/2015 1,322,885.00 739.90 861.96 18.67
2/25/2015 1,445,348.00 803.32 793.10 5.75
2/26/2015 1,578,102.00 926.31 948.47 3.97
2/27/2015 1,403,948.00 815.98 911.72 1.58
2/28/2015 1,256,617.00 739.84 785.45 3.14
February Totals 66,611,790.00 29,554.37 29,754.98 38,362.74
  • * Natural gas is used for both pilot and purge gas for the refinery flare system, except for the Emergency Flare that uses nitrogen as purge gas. The flow is determined using an orifice calculation based on the orifice size in the lines and the line pressure upstream of the orifice.
    ** The purge gas and pilot gas flows at the Ammonia Plant flare are measured by rotameters in the natural gas and nitrogen lines.
    *** The purge gas and pilot gas flows at the 50 Unit flare are measured by flow meters
    **** Corrected for seal pot level and pressure data
    ***** 50 Unit change in flare purge gas to nitrogen
    ARU Flare
    In the month of February 2015, the ARU had one 330 SCFM event, no >500,00 SCF per day events, and no >500 lbs SO2 events. The one >330 SCFM event occurred on 2/3/15 for approximately 25 minutes during the ARU shutdown. The molecular weight indicates that mainly ammonia was flared.
Tesoro Martinez Main Refinery Flare Report 2/1/2015 - 2/28/2015
 
 