Bay Area Air Quality Management District spacer
Site Search      
spacer spacer
spacer spacer MOP - Volume 4 Source Test Policy and Procedures
spacer spacer spacer

spacer
graphic

Policy # Source Test Policy
Format
  SOURCE TEST POLICY (Includes following topics)
1 Introduction  
1.2 General Provisions  
1.2.1 Definitions  
1.2.2 Representative Sampling  
1.2.3 Sample Points  
1.2.4 Sampling Facilities  
1.2.5 Quality Assurance  
1.3 Alternate Methods  
1.4 NSPS and NESHAPS Testing  
1.5 Tests Conducted by Other Persons  
1.6 Process Information  
1.7 Applicability  


Procedure # Reg. Source Test Procedures
ST-1B 7 Ammonia, Integrated Sampling (Reg. 7)
ST-2 11 Beryllium Sampling (Reg. 11)
ST-3 8 Bulk Gasoline Transfer Plants (500-20,000 GPD) (Reg. 8)
ST-4 8 Bulk Gasoline Loading Terminals (Reg.8) (Deleted)
ST-5 6 Carbon Dioxide, Continuous Sampling (Reg. 6)
ST-6 8,10 Carbon Monoxide, Continuous Sampling (Regs. 8 & 10)
ST-7 8 Non-Methane Organic Carbon Sampling (Reg. 8)
ST-8 7 Dimethylsulfide Sampling (Reg. 7)
ST-9 10,11 Lead Sampling (Regs. 10 & 11)
ST-10 11 Mercury Sampling (Reg. 11)
ST-11 7 Mercaptans, Integrated Sampling (Reg. 7)
ST-12 7 Collection of Odorous Samples (Reg. 7)
ST-13A 9,10 Oxides of Nitrogen, Continuous Sampling (Regs. 9 & 10)
ST-13B 9,10 Oxides of Nitrogen, Integrated Sampling(Regs. 9 & 10) (Deleted)
ST-14 9 Oxygen, Continuous Sampling (Regs. 9)
ST-15 6,10 Particulate Sampling (Regs. 6 & 10)
ST-16 7 Phenolic Compounds Sampling (Reg. 7)
ST-17   Stack Gas Velocity and Volumetric Flowrate
ST-18   Stack Traverse Point Determination
ST-19A 9,10 Sulfur Dioxide, Continuous Sampling (Regs. 9 & 10)
ST-19B 9,10 Sulfur Oxides, Integrated Sampling (Regs. 9 & 10) (Deleted)
ST-20 6,9,10,13 Sulfur Dioxide, Sulfur Trioxide and Sulfuric Acid Mist (Regs. 6, 9, 10 & 12)
ST-21 12 Total Reduced Sulfur Sampling (Reg. 12)
ST-22 7 Trimethylamine Sampling (Reg. 7)
ST-23   Water Vapor Sampling
ST-24 6,8,9,10 Evacuated Cylinder Sampling for Orsat Analysis (CO, CO 2 , O 2 ) (Regs. 6, 8, 9 & 10)
ST-25 10 Fluoride, Integrated Sampling (Reg. 10)
ST-26 10 Coke Burn-Off Rate (Reg. 10) (Deleted)
ST-27 8 GDF Dynamic Back Pressure Test (Reg. 8) (Revised: September 9, 2002)
ST-28 10 Hydrogen Sulfide, Integrated Sampling (Reg. 10)
ST-29 11 Vinyl Chloride (Reg. 11)
ST-30 8 Static Pressure Integrity Test, Underground Storage Tanks (Reg. 8) (Revised: September 9, 2002)
ST-31 8 Perchloroethylene (Reg. 8)
ST-32 8 Ethanol, Integrated Sampling (Reg. 8)
ST-33 8 Gasoline Cargo Tanks (Reg. 8)
ST-34 8,10 Bulk and Marine Loading Terminals Vapor Recovery Units (Regs. 8 & 10) Last amended 12/7/05
ST-35 11 Total And Hexavalent Chromium (Reg. 11)
ST-36 8 Gasoline Dispensing Facility Phase I Volumetric Efficiency (Reg. 8)
ST-37 8 Gasoline Dispensing Facility Liquid Removal Devices (Reg. 8)
ST-38 8 Gasoline Dispensing Facility Static Pressure Integrity - Aboveground Vaulted Tanks (Reg. 8)
ST-39 8 GDF Air To Liquid Volumetric Ratio Test (Reg. 8) (Revised: September 9, 2002)
spacer spacer
spacer spacer spacer spacer spacer spacer
Disclaimer    Email comments