Air Quality Advisory
Air Quality Advisory for smoke issued for Bay Area through Sunday. See our Wildfire Safety Tips web page.

Mga Pagpapayo sa Tuntunin

Tingnan ang mga pagpapayo sa mga tuntunin ng Distrito ng Hangin; ang mga dokumento na ito sa patnubay ay tumutulong na panatilihin ng kinokontrol na komunidad ang pagsunod sa mga tuntunin at regulasyon sa pagpaparumi sa hangin.

May Kaugnayan sa Agrikultura

Hakbang sa Pagkontrol ng Nakalalason sa Hangin - ATCM

Demolisyon at Renobasyon na Kaugnay ng Asbestos

YearDateDocumenttable-mobile-only-column
20166/30/2016Asbestos Demolition and Renovation Fee Increase
2016
Date:
6/30/2016
Document:
Asbestos Demolition and Renovation Fee Increase
20164/7/2016Asbestos Demolition and Renovation Compliance Advisory
2016
Date:
4/7/2016
Document:
Asbestos Demolition and Renovation Compliance Advisory
20157/1/20152015 Asbestos Fee Increase
2015
Date:
7/1/2015
Document:
2015 Asbestos Fee Increase
20146/25/2014Asbestos Demolition and Renovation Fee Increase
2014
Date:
6/25/2014
Document:
Asbestos Demolition and Renovation Fee Increase
20134/24/2013New Credit and Debit Card Procedures for Asbestos Demo and Reno Operations
2013
Date:
4/24/2013
Document:
20122/28/2012Removal of Asbestos Cement (Transite) Siding and Roofing Products
2012
Date:
2/28/2012
Document:
19932/4/1993Applicability Determiniation - Sheetrock Joint Compund
1993
Date:
2/4/1993
Document:
Applicability Determiniation - Sheetrock Joint Compund
20066/21/2006Asbestos Control Requirements for Pipe Bursting and Pipe Reaming
2006
Date:
6/21/2006
Document:

Bulk na mga Terminal at Bulk na mga Planta

YearDateDocumenttable-mobile-only-column
201110/27/2011Gasoline Bulk Terminal Maintenance and Repair Requirement
2011
Date:
10/27/2011
Document:
201110/27/2011Gasoline Bulk Plant Maintenance and Repair Requirement
2011
Date:
10/27/2011
Document:
Gasoline Bulk Plant Maintenance and Repair Requirement
201011/16/2010New Compliance Deadlines for Gasoline Bulk Terminals and Gasoline Cargo Tanks (Regulation 8, Rule 33)
2010
Date:
11/16/2010
201011/16/2010New Emission and Reporting Requirements for Gasoline Bulk Plants and Gasoline Cargo Tanks (Regulation 8, Rule 39)

Pagbabago ng Klima

YearDateDocumenttable-mobile-only-column
20112/9/2011Greenhouse Gas Emissions from Semiconductors
2011
Date:
2/9/2011
Document:
Greenhouse Gas Emissions from Semiconductors

Mga Pamahid

YearDateDocumenttable-mobile-only-column
20122/3/2012Regulation 8-32 Formaldehyde Emissions Estimates and Reporting Requirements for Wood Products Coatings
2012
Date:
2/3/2012
20119/1/2011Regulation 8-3: Architectural Coatings, Upcoming Compliance Deadline for New VOC Limits
2011
Date:
9/1/2011
20103/15/2010New and revised requirements for wood products coatings
2010
Date:
3/15/2010
Document:
20094/8/2009Motor Vehicle and Mobile Equipment Coating Operations
2009
Date:
4/8/2009
Document:
Motor Vehicle and Mobile Equipment Coating Operations
20094/8/2009Rule Changes for Mobile Refinishing Operation
2009
Date:
4/8/2009
Document:
Rule Changes for Mobile Refinishing Operation
20096/15/2009New Monitoring and Record Keeping Requirements for Commercial Digital Printers
2009
Date:
6/15/2009
20096/15/2009Registration and Reporting Requirements for Graphic Arts Printing and Coating Facilities
2009
Date:
6/15/2009
20097/27/2009Manufacturers and Suppliers of Graphic Arts Printing and Coating Operations
2009
Date:
7/27/2009
20112/15/2011New Architectural Coating Requirements
2011
Date:
2/15/2011
Document:
New Architectural Coating Requirements
20102/25/2010New Requirement Prohibiting Possession of Non-compliant Coatings
2010
Date:
2/25/2010
Document:
20118/1/2011New Requirement Prohibiting Use of Atomized Spray Techniques to Apply Resins to Open Molds
2011
Date:
8/1/2011
201011/3/2010New Requirements for Polyester Resin Operations, Reg 8-50
2010
Date:
11/3/2010
Document:
New Requirements for Polyester Resin Operations, Reg 8-50

May Pagniningas na Kagamitan

YearDateDocumenttable-mobile-only-column
20122/6/2012Boiler Certification Requirement Reminder
2012
Date:
2/6/2012
Document:
Boiler Certification Requirement Reminder
201112/23/2011Reg. 9-8: New Emission Limits for Stationary IC Engines
2011
Date:
12/23/2011
Document:
Reg. 9-8: New Emission Limits for Stationary IC Engines
20117/7/2011New Air Pollution Emission Limits and Requirements for Boiler Owner/Operators
2011
Date:
7/7/2011
20117/7/2011New Air Pollution Emission Limits and Certification Requirements for Boiler Manufacturers
2011
Date:
7/7/2011
20117/7/2011Updated Frequently Asked Questions: Boilers and the Air District's Regulation 9, Rule 7
2011
Date:
7/7/2011
20111/20/2011Air Pollution Emission Limits and Requirements for Boiler Owner/Operators
2011
Date:
1/20/2011
20111/20/2011Air Pollution Emission Limits and Requirements for Boiler Manufacturers
2011
Date:
1/20/2011
Document:
20111/20/2011Frequently Asked Questions: Boilers and the Air District's Regulation 9, Rule 7
2011
Date:
1/20/2011
20086/10/2008New Regulation 9, Rule 8, Nitrogen Oxide and Carbon Monoxide Emission Limits for Stationary Internal Combustion Engines
20081/17/2008New Regulation 9, Rule 6, Emission Limits for Natural Gas-Fired Water Heaters and Boliers
2008
Date:
1/17/2008

Dry Cleaner

YearDateDocumenttable-mobile-only-column
20102/25/2010Third Notice- Facilities subject to Phase-Out of Perchloroethylene (PERC) Dry Cleaning Operations
2010
Date:
2/25/2010
20105/4/2010Phase-out of Perchloroethylene Dry Cleaning Machines- Cantonese
2010
Date:
5/4/2010
Document:
20105/4/2010Phase-out of Perchloroethylene Dry Cleaning Machines- English
2010
Date:
5/4/2010
Document:
20105/4/2010Phase-out of Perchloroethylene Dry Cleaning Machines- Korean
2010
Date:
5/4/2010
Document:
20105/4/2010Phase-out of Percholorethylene Dry Cleaning Machines- Spanish
2010
Date:
5/4/2010
Document:
20096/1/2009New Requirements for Perchloroethylene and Synthetic Solvent Dry Cleaning Operations
2009
Date:
6/1/2009
20087/1/2008New State Airborne Toxic Control Measure (ATCM) Requirements for Emissions of Perchloroethylene (PERC) from Dry Cleaning Operations
200912/16/2009New Requirements for Perchloroethylene (PERC) and Synthetic Solvent Dry Cleaning Operations
2009
Date:
12/16/2009

Mga Liyab

Mga Pasilidad ng Pamamahagi ng Gas(GDF)/Mga Istasyon ng Serbisyo

YearDateDocumenttable-mobile-only-column
20187/23/2018GDF Compliance Reminder - Sept. 24, 2018, Deadline to Install Low Permeation Hoses
2018
Date:
7/23/2018
20143/14/2014Temporary Exemption for Low Throughput ASTs from July 1, 2014 Phase I EVR upgrade Deadline
2014
Date:
3/14/2014
20136/4/2013Aboveground Storage Tanks Phase I EVR Upgrade Deadline
2013
Date:
6/4/2013
Document:
Aboveground Storage Tanks Phase I EVR Upgrade Deadline
20133/18/2013Attn: GDF Testing Contractors: Updated Procedures for Notification and Submission of GDF Source Tests
2013
Date:
3/18/2013
20133/8/2013Standing Loss Control Requirements for Aboveground Storage Tanks
2013
Date:
3/8/2013
Document:
20123/30/2012Enforcement Program for Upgrading Gas Stations with Liquid Condensate Trap to Meet Enhanced Vapor Recovery Phase II and In-Station Diagnostics April 1, 2012 Deadline
20108/31/2010In-Station Diagnostics (ISD) September 1, 2010 Deadline Compliance Agreement Program
2010
Date:
8/31/2010
20105/28/2010California Air Resources Board: VST Nozzle Daily Check
2010
Date:
5/28/2010
Document:
California Air Resources Board: VST Nozzle Daily Check
20105/24/2010September 1, 2010 Deadline to Install In-Station Diagnostic (ISD)
2010
Date:
5/24/2010
Document:
20093/20/2009Enforcement Program for Enhanced Vapor Recovery (EVR) Phase II April 1, 2009 Deadline
2009
Date:
3/20/2009
20086/26/2008Operators of Retail Underground Gasoline Tanks - Enhanced Vapor Recovery (EVR) Phase II Deadline April 1, 2009
20086/26/2008 Operators of Non-Retail Underground Gasoline Tanks - Enhanced Vapor Recovery (EVR) Phase II Deadline April 1, 2009
20064/3/2006Gasoline Bulk Fuel Delivery Drivers - Phase I “Out of Order” Tags on Bulk Fueling Delivery Points
2006
Date:
4/3/2006
20064/3/2006Operators of Underground Gasoline Tanks - Phase I “Out of Order” Tags on Bulk Fueling Delivery Points
20058/17/2005ORVR Deadlines
2005
Date:
8/17/2005
Document:
ORVR Deadlines
20053/30/2005Phase I EVR Policy
2005
Date:
3/30/2005
Document:
Phase I EVR Policy
20053/16/2005EVR Phase I Deadline
2005
Date:
3/16/2005
Document:
EVR Phase I Deadline
20048/30/2004EVR Deadline
2004
Date:
8/30/2004
Document:
EVR Deadline
20045/17/2004GDF Check Valves
2004
Date:
5/17/2004
Document:
GDF Check Valves
20045/5/2004GDF Drain Valves
2004
Date:
5/5/2004
Document:
GDF Drain Valves
20041/20/2004Gilbarco VaporVac Testing
2004
Date:
1/20/2004
Document:
Gilbarco VaporVac Testing
200312/11/2003EVR Phase II
2003
Date:
12/11/2003
Document:
EVR Phase II
20032/26/2003Annual Testing Requirements
2003
Date:
2/26/2003
Document:
Annual Testing Requirements

Mga Tagapagpatakbo ng Terminal na Pandagat/Mga Sasakyang-dagat

Mga Pasilidad ng Metal

YearDateDocumenttable-mobile-only-column
20141/13/2014Guidance to Prepare Regulation 12-13 Emissions Minimization Plan
2014
Date:
1/13/2014
Document:
20141/13/2014EMP Template
2014
Date:
1/13/2014
Document:
EMP Template
20143/27/2014Regulation 6-4 Emissions Minimization Plan Template
2014
Date:
3/27/2014
Document:
Regulation 6-4 Emissions Minimization Plan Template
20143/27/2014Guidance to Prepare Regulation 6-4 Emissions Minimization Plan
2014
Date:
3/27/2014
Document:
20136/17/2013Foundry and Forging, Regulation 12-13, Operation and Maintenance Requirements
2013
Date:
6/17/2013
20138/27/2013Foundry and Forge Recordkeeping Requirements
2013
Date:
8/27/2013
Document:
Foundry and Forge Recordkeeping Requirements
20138/27/2013Regulation 6, Rule 4, Metal Recycling and Shredding Recordkeeping Requirements
2013
Date:
8/27/2013

Bukas na Pagsunog

YearDateDocumenttable-mobile-only-column
20186/7/20182018 Open Burning Fees Compliance Advisory
2018
Date:
6/7/2018
Document:
2018 Open Burning Fees Compliance Advisory
20177/1/20172017 Open Burning Fees Compliance Advisory
2017
Date:
7/1/2017
Document:
2017 Open Burning Fees Compliance Advisory
20166/22/20162016 Open Burning Fees Compliance Advisory
2016
Date:
6/22/2016
Document:
2016 Open Burning Fees Compliance Advisory
20157/1/20152015 Open Burning Fee Updates
2015
Date:
7/1/2015
Document:
2015 Open Burning Fee Updates
20146/10/2014Open Burning Fees Update
2014
Date:
6/10/2014
Document:
Open Burning Fees Update
20138/19/2013New Online Payment Options for Open Burning Fees
2013
Date:
8/19/2013
Document:
New Online Payment Options for Open Burning Fees
20137/18/2013New Open Burn Fees for Prescribed, Marsh and Stubble Burns
2013
Date:
7/18/2013
Document:
20137/9/2013New Open Burn Operation Fees
2013
Date:
7/9/2013
Document:
New Open Burn Operation Fees
20099/28/2009Spring 2010 Marsh Burn Season
2009
Date:
9/28/2009
Document:
Spring 2010 Marsh Burn Season
20068/24/2006Approval Procedures for Fall 2006 Marsh Burn Season
2006
Date:
8/24/2006
Document:
Approval Procedures for Fall 2006 Marsh Burn Season
20062/9/2006New Procedures for Spring Marsh Burning
2006
Date:
2/9/2006
Document:
New Procedures for Spring Marsh Burning
20055/9/2005Prohibition on Burning Chemically Treated Wooden Grapestakes
2005
Date:
5/9/2005
Document:

Nabibitbit na Kagamitan

YearDateDocumenttable-mobile-only-column
20131/23/20132013 Fleet Emission Requirements and Reporting
2013
Date:
1/23/2013
Document:
2013 Fleet Emission Requirements and Reporting
200912/23/2009Tier 0 Engines
2009
Date:
12/23/2009
Document:
Tier 0 Engines

Mga Maiuulat na Aktibidad sa Pagsunod (RCA)

YearDateDocumenttable-mobile-only-column
20051/14/2005 CEM - Revision to Span Gas Protocol
2005
Date:
1/14/2005
Document:
CEM - Revision to Span Gas Protocol
20066/30/2006Reportable Compliance Activity (RCA) Policies (previously referred to as "Episodes")
2006
Date:
6/30/2006
200412/3/2004Breakdown Excess Emission Calculations
2004
Date:
12/3/2004
Document:
Breakdown Excess Emission Calculations

Mga Restoran

YearDateDocumenttable-mobile-only-column
20131/24/2013Requirements for Restaurants with Under-Fired Charbroilers
2013
Date:
1/24/2013
Document:
20098/3/2009Certification Requirements for Emission Control Devices
2009
Date:
8/3/2009
Document:
Certification Requirements for Emission Control Devices
20098/3/2009Requirements for Restaurants with New Under Fired Charbroilers