Air District Operations

The Air District is taking steps to ensure Bay Area air quality and public health are protected while the shelter-in-place orders are in effect. Permits for businesses adjusting operations to aid in the public health response will also be expedited. Read more... | en Español

Wood Burning Prohibited

Spare the Air Alert in effect through Friday, October 2.  Wood burning is banned.  Burn bans can occur year-round for wildfires. Smoke from wildfires is impacting air quality.  See our hourly air quality data for the most up-to-date information, as well as Press Releases@AirDistrict, and our Wildfire Safety Tips web page.  Sign up for Bay Area Air Alerts.  en Español

Recomendaciones sobre las reglas

Vea las recomendaciones sobre las reglas del Distrito; estos documentos de guía ayudan a la comunidad regulada a mantener el cumplimiento de las reglas y las regulaciones sobre la contaminación del aire.

Relacionados con la agricultura

Medida de control de contaminantes tóxicos del aire (ATCM)

YearDateDocumenttable-mobile-only-column
201905/06/2019NOA Compliance Advisory
2019
Date:
05/06/2019
Document:
NOA Compliance Advisory
200804/03/2008Permit Advisory - Airborne Toxic Control Measure (ATCM) for Chromium Plating and Chromic Acid Anodizing Facilities
200608/08/2006Asbestos Airborne Toxic Control Measure (ATCM) for Construction and Grading Projects
2006
Date:
08/08/2006

Demolición y renovación de asbesto

YearDateDocumenttable-mobile-only-column
201905/06/2019Mastic Fee Change Advisory
2019
Date:
05/06/2019
Document:
Mastic Fee Change Advisory
201630/06/2016Asbestos Demolition and Renovation Fee Increase
2016
Date:
30/06/2016
Document:
Asbestos Demolition and Renovation Fee Increase
201607/04/2016Asbestos Demolition and Renovation Compliance Advisory
2016
Date:
07/04/2016
Document:
Asbestos Demolition and Renovation Compliance Advisory
201501/07/20152015 Asbestos Fee Increase
2015
Date:
01/07/2015
Document:
2015 Asbestos Fee Increase
201425/06/2014Asbestos Demolition and Renovation Fee Increase
2014
Date:
25/06/2014
Document:
Asbestos Demolition and Renovation Fee Increase
201324/04/2013New Credit and Debit Card Procedures for Asbestos Demo and Reno Operations
2013
Date:
24/04/2013
Document:
201228/02/2012Removal of Asbestos Cement (Transite) Siding and Roofing Products
2012
Date:
28/02/2012
Document:
199304/02/1993Applicability Determiniation - Sheetrock Joint Compund
1993
Date:
04/02/1993
Document:
Applicability Determiniation - Sheetrock Joint Compund
200621/06/2006Asbestos Control Requirements for Pipe Bursting and Pipe Reaming
2006
Date:
21/06/2006
Document:

Terminales y plantas a granel

YearDateDocumenttable-mobile-only-column
201127/10/2011Gasoline Bulk Terminal Maintenance and Repair Requirement
2011
Date:
27/10/2011
Document:
201127/10/2011Gasoline Bulk Plant Maintenance and Repair Requirement
2011
Date:
27/10/2011
Document:
Gasoline Bulk Plant Maintenance and Repair Requirement
201016/11/2010New Compliance Deadlines for Gasoline Bulk Terminals and Gasoline Cargo Tanks (Regulation 8, Rule 33)
2010
Date:
16/11/2010
201016/11/2010New Emission and Reporting Requirements for Gasoline Bulk Plants and Gasoline Cargo Tanks (Regulation 8, Rule 39)

Cambio climático

YearDateDocumenttable-mobile-only-column
201109/02/2011Greenhouse Gas Emissions from Semiconductors
2011
Date:
09/02/2011
Document:
Greenhouse Gas Emissions from Semiconductors

Recubrimientos

YearDateDocumenttable-mobile-only-column
201203/02/2012Regulation 8-32 Formaldehyde Emissions Estimates and Reporting Requirements for Wood Products Coatings
2012
Date:
03/02/2012
201101/09/2011Regulation 8-3: Architectural Coatings, Upcoming Compliance Deadline for New VOC Limits
2011
Date:
01/09/2011
201015/03/2010New and revised requirements for wood products coatings
2010
Date:
15/03/2010
Document:
New and revised requirements for wood products coatings
200908/04/2009Motor Vehicle and Mobile Equipment Coating Operations
2009
Date:
08/04/2009
Document:
Motor Vehicle and Mobile Equipment Coating Operations
200908/04/2009Rule Changes for Mobile Refinishing Operation
2009
Date:
08/04/2009
Document:
Rule Changes for Mobile Refinishing Operation
200915/06/2009New Monitoring and Record Keeping Requirements for Commercial Digital Printers
2009
Date:
15/06/2009
200915/06/2009Registration and Reporting Requirements for Graphic Arts Printing and Coating Facilities
2009
Date:
15/06/2009
200927/07/2009Manufacturers and Suppliers of Graphic Arts Printing and Coating Operations
2009
Date:
27/07/2009
Document:
201115/02/2011New Architectural Coating Requirements
2011
Date:
15/02/2011
Document:
New Architectural Coating Requirements
201025/02/2010New Requirement Prohibiting Possession of Non-compliant Coatings
2010
Date:
25/02/2010
Document:
201101/08/2011New Requirement Prohibiting Use of Atomized Spray Techniques to Apply Resins to Open Molds
2011
Date:
01/08/2011
201003/11/2010New Requirements for Polyester Resin Operations, Reg 8-50
2010
Date:
03/11/2010
Document:
New Requirements for Polyester Resin Operations, Reg 8-50

Equipos de combustión

YearDateDocumenttable-mobile-only-column
202001/04/2020Small Boiler Stipulated Order for Abatement Program Advisory
2020
Date:
01/04/2020
Document:
201907/09/20199-7 Compliance Reminder
2019
Date:
07/09/2019
Document:
9-7 Compliance Reminder
201206/02/2012Boiler Certification Requirement Reminder
2012
Date:
06/02/2012
Document:
Boiler Certification Requirement Reminder
201123/12/2011Reg. 9-8: New Emission Limits for Stationary IC Engines
2011
Date:
23/12/2011
Document:
Reg. 9-8: New Emission Limits for Stationary IC Engines
201107/07/2011New Air Pollution Emission Limits and Requirements for Boiler Owner/Operators
2011
Date:
07/07/2011
201107/07/2011New Air Pollution Emission Limits and Certification Requirements for Boiler Manufacturers
2011
Date:
07/07/2011
201107/07/2011Updated Frequently Asked Questions: Boilers and the Air District's Regulation 9, Rule 7
2011
Date:
07/07/2011
201120/01/2011Air Pollution Emission Limits and Requirements for Boiler Owner/Operators
2011
Date:
20/01/2011
Document:
201120/01/2011Air Pollution Emission Limits and Requirements for Boiler Manufacturers
2011
Date:
20/01/2011
Document:
201120/01/2011Frequently Asked Questions: Boilers and the Air District's Regulation 9, Rule 7
2011
Date:
20/01/2011
200810/06/2008New Regulation 9, Rule 8, Nitrogen Oxide and Carbon Monoxide Emission Limits for Stationary Internal Combustion Engines
200817/01/2008New Regulation 9, Rule 6, Emission Limits for Natural Gas-Fired Water Heaters and Boliers
2008
Date:
17/01/2008

Tienda de lavado en seco

YearDateDocumenttable-mobile-only-column
201025/02/2010Third Notice- Facilities subject to Phase-Out of Perchloroethylene (PERC) Dry Cleaning Operations
2010
Date:
25/02/2010
201004/05/2010Phase-out of Perchloroethylene Dry Cleaning Machines- Cantonese
2010
Date:
04/05/2010
Document:
201004/05/2010Phase-out of Perchloroethylene Dry Cleaning Machines- English
2010
Date:
04/05/2010
Document:
201004/05/2010Phase-out of Perchloroethylene Dry Cleaning Machines- Korean
2010
Date:
04/05/2010
Document:
201004/05/2010Phase-out of Percholorethylene Dry Cleaning Machines- Spanish
2010
Date:
04/05/2010
Document:
200901/06/2009New Requirements for Perchloroethylene and Synthetic Solvent Dry Cleaning Operations
2009
Date:
01/06/2009
200801/07/2008New State Airborne Toxic Control Measure (ATCM) Requirements for Emissions of Perchloroethylene (PERC) from Dry Cleaning Operations
200916/12/2009New Requirements for Perchloroethylene (PERC) and Synthetic Solvent Dry Cleaning Operations
2009
Date:
16/12/2009

Combustión por antorcha

Instalaciones de distribución y abastecimiento de gasolina (GDF)/estaciones de servicio

YearDateDocumenttable-mobile-only-column
201822/07/2018GDF Compliance Reminder - Sept. 24, 2018, Deadline to Install Low Permeation Hoses
2018
Date:
22/07/2018
201414/03/2014Temporary Exemption for Low Throughput ASTs from July 1, 2014 Phase I EVR upgrade Deadline
2014
Date:
14/03/2014
201304/06/2013Aboveground Storage Tanks Phase I EVR Upgrade Deadline
2013
Date:
04/06/2013
Document:
Aboveground Storage Tanks Phase I EVR Upgrade Deadline
201318/03/2013Attn: GDF Testing Contractors: Updated Procedures for Notification and Submission of GDF Source Tests
2013
Date:
18/03/2013
201308/03/2013Standing Loss Control Requirements for Aboveground Storage Tanks
2013
Date:
08/03/2013
Document:
201230/03/2012Enforcement Program for Upgrading Gas Stations with Liquid Condensate Trap to Meet Enhanced Vapor Recovery Phase II and In-Station Diagnostics April 1, 2012 Deadline
201031/08/2010In-Station Diagnostics (ISD) September 1, 2010 Deadline Compliance Agreement Program
2010
Date:
31/08/2010
201028/05/2010California Air Resources Board: VST Nozzle Daily Check
2010
Date:
28/05/2010
Document:
California Air Resources Board: VST Nozzle Daily Check
201024/05/2010September 1, 2010 Deadline to Install In-Station Diagnostic (ISD)
2010
Date:
24/05/2010
Document:
200920/03/2009Enforcement Program for Enhanced Vapor Recovery (EVR) Phase II April 1, 2009 Deadline
2009
Date:
20/03/2009
200826/06/2008Operators of Retail Underground Gasoline Tanks - Enhanced Vapor Recovery (EVR) Phase II Deadline April 1, 2009
200826/06/2008 Operators of Non-Retail Underground Gasoline Tanks - Enhanced Vapor Recovery (EVR) Phase II Deadline April 1, 2009
200603/04/2006Gasoline Bulk Fuel Delivery Drivers - Phase I “Out of Order” Tags on Bulk Fueling Delivery Points
2006
Date:
03/04/2006
200603/04/2006Operators of Underground Gasoline Tanks - Phase I “Out of Order” Tags on Bulk Fueling Delivery Points
2006
Date:
03/04/2006
200517/08/2005ORVR Deadlines
2005
Date:
17/08/2005
Document:
ORVR Deadlines
200530/03/2005Phase I EVR Policy
2005
Date:
30/03/2005
Document:
Phase I EVR Policy
200516/03/2005EVR Phase I Deadline
2005
Date:
16/03/2005
Document:
EVR Phase I Deadline
200430/08/2004EVR Deadline
2004
Date:
30/08/2004
Document:
EVR Deadline
200417/05/2004GDF Check Valves
2004
Date:
17/05/2004
Document:
GDF Check Valves
200405/05/2004GDF Drain Valves
2004
Date:
05/05/2004
Document:
GDF Drain Valves
200420/01/2004Gilbarco VaporVac Testing
2004
Date:
20/01/2004
Document:
Gilbarco VaporVac Testing
200311/12/2003EVR Phase II
2003
Date:
11/12/2003
Document:
EVR Phase II
200326/02/2003Annual Testing Requirements
2003
Date:
26/02/2003
Document:
Annual Testing Requirements

Operadores de terminales marítimas/embarcaciones marinas

Instalaciones de metal

YearDateDocumenttable-mobile-only-column
201413/01/2014Guidance to Prepare Regulation 12-13 Emissions Minimization Plan
2014
Date:
13/01/2014
Document:
201413/01/2014EMP Template
2014
Date:
13/01/2014
Document:
EMP Template
201427/03/2014Regulation 6-4 Emissions Minimization Plan Template
2014
Date:
27/03/2014
Document:
Regulation 6-4 Emissions Minimization Plan Template
201427/03/2014Guidance to Prepare Regulation 6-4 Emissions Minimization Plan
2014
Date:
27/03/2014
Document:
201317/06/2013Foundry and Forging, Regulation 12-13, Operation and Maintenance Requirements
2013
Date:
17/06/2013
201327/08/2013Foundry and Forge Recordkeeping Requirements
2013
Date:
27/08/2013
Document:
Foundry and Forge Recordkeeping Requirements
201327/08/2013Regulation 6, Rule 4, Metal Recycling and Shredding Recordkeeping Requirements
2013
Date:
27/08/2013

Quema al aire libre

YearDateDocumenttable-mobile-only-column
201925/06/20192019 Open Burning Fees Compliance Advisory
2019
Date:
25/06/2019
Document:
2019 Open Burning Fees Compliance Advisory
201806/06/20182018 Open Burning Fees Compliance Advisory
2018
Date:
06/06/2018
Document:
2018 Open Burning Fees Compliance Advisory
201730/06/20172017 Open Burning Fees Compliance Advisory
2017
Date:
30/06/2017
Document:
2017 Open Burning Fees Compliance Advisory
201622/06/20162016 Open Burning Fees Compliance Advisory
2016
Date:
22/06/2016
Document:
2016 Open Burning Fees Compliance Advisory
201501/07/20152015 Open Burning Fee Updates
2015
Date:
01/07/2015
Document:
2015 Open Burning Fee Updates
201410/06/2014Open Burning Fees Update
2014
Date:
10/06/2014
Document:
Open Burning Fees Update
201319/08/2013New Online Payment Options for Open Burning Fees
2013
Date:
19/08/2013
Document:
New Online Payment Options for Open Burning Fees
201318/07/2013New Open Burn Fees for Prescribed, Marsh and Stubble Burns
2013
Date:
18/07/2013
Document:
New Open Burn Fees for Prescribed, Marsh and Stubble Burns
201309/07/2013New Open Burn Operation Fees
2013
Date:
09/07/2013
Document:
New Open Burn Operation Fees
200928/09/2009Spring 2010 Marsh Burn Season
2009
Date:
28/09/2009
Document:
Spring 2010 Marsh Burn Season
200624/08/2006Approval Procedures for Fall 2006 Marsh Burn Season
2006
Date:
24/08/2006
Document:
Approval Procedures for Fall 2006 Marsh Burn Season
200609/02/2006New Procedures for Spring Marsh Burning
2006
Date:
09/02/2006
Document:
New Procedures for Spring Marsh Burning
200509/05/2005Prohibition on Burning Chemically Treated Wooden Grapestakes
2005
Date:
09/05/2005
Document:

Equipos portátiles

YearDateDocumenttable-mobile-only-column
201323/01/20132013 Fleet Emission Requirements and Reporting
2013
Date:
23/01/2013
Document:
2013 Fleet Emission Requirements and Reporting
200923/12/2009Tier 0 Engines
2009
Date:
23/12/2009
Document:
Tier 0 Engines

Actividades de cumplimiento reportables (RCA)

YearDateDocumenttable-mobile-only-column
201914/01/2019Reportable Compliance Activities
2019
Date:
14/01/2019
Document:
Reportable Compliance Activities
200514/01/2005 CEM - Revision to Span Gas Protocol
2005
Date:
14/01/2005
Document:
CEM - Revision to Span Gas Protocol
200630/06/2006Reportable Compliance Activity (RCA) Policies (previously referred to as "Episodes")
2006
Date:
30/06/2006
200403/12/2004Breakdown Excess Emission Calculations
2004
Date:
03/12/2004
Document:
Breakdown Excess Emission Calculations

Restaurantes