Regulation 2 Rule 2: New Source Review

The Air District is currently evaluating potential concepts to amend rules within Regulation 2: Permits. For more information, please visit the Regulation 2 Amendments web page.

Amendments to Regulation 2, Rule 2: Permits - New Source Review were adopted by the Air District's Board of Directors at a public hearing on December 6, 2017:

The Air District developed revisions to its permitting programs through amendments to Regulation 2, Rule 2: Permits - New Source Review. The amendments to this rule were developed and adopted along with other changes to the permits regulation. Amendments to Rule 2-2, along with amendments to Rule 2-1, Rule 2-4, and Rule 2-6, made significant changes to the New Source Review pre-construction permit program and the Title V Major Facility Review operating permit program. All information on the rule development process for the amendments to Rules 2-1, 2-2, 2-4, and 2-6 can be found on the Permit Regulations Changes page.

 

 Rule #Rule NameAdoptedAmendedtable-mobile-only-column
Regulation 2, Rule 2New Source ReviewN/A12/5/2017
Adopted
Document:
Description:
Applies to new or modified sources. Rule 2 contains requirements for Best Available Control Technology and emission offsets. Rule 2 implements federal New Source Review and Prevention of Significant Deterioration requirements.
Rule #:
Regulation 2, Rule 2
Rule Name:
New Source Review
Adopted:
N/A
Amended:
12/5/2017
Contact:
  • Engineering
  • General Engineering Information
  • 415.749.4990
 

Rule Status

Adopted

Document

Amended Regulation 2, Rule 2: Permits – New Source Review

Contact

  • Engineering
  • General Engineering Information
  • 415.749.4990

Description

Applies to new or modified sources. Rule 2 contains requirements for Best Available Control Technology and emission offsets. Rule 2 implements federal New Source Review and Prevention of Significant Deterioration requirements.