Regulation 2 Rule 5: New Source Review of Toxic Air Contaminants

 Rule #Rule NameAdoptedAmendedtable-mobile-only-column
Regulation 2, Rule 5New Source Review of Toxic Air Contaminants6/14/200512/6/2016
Adopted
Document:
New Source Review of Toxic Air Contaminants
Description:
Applies preconstruction permit review to new and modified sources of toxic air contaminants; contains project health risk limits and requirements for Toxics Best Available Control Technology.
Rule #:
Regulation 2, Rule 5
Rule Name:
New Source Review of Toxic Air Contaminants
Adopted:
6/14/2005
Amended:
12/6/2016
Contact:
  • Engineering
  • General Engineering Information
  • 415.749.4990
 

Rule Status

Adopted

Document

New Source Review of Toxic Air Contaminants

Contact

  • Engineering
  • General Engineering Information
  • 415.749.4990

Description

Applies preconstruction permit review to new and modified sources of toxic air contaminants; contains project health risk limits and requirements for Toxics Best Available Control Technology.

Spare the Air Status

Last Updated: 8/9/2019