|
Notice
|
The Air District Board approved updates to the zero-NOx water heater rule that delay implementation to January 2028 and allow exemptions for low-income homeowners, properties with electrical limitations and space-constrained homes. View press release(181 Kb PDF, 2 pgs, posted 2026/11/4).
查看當前的第五章表格、公告、續展申請及下列表格中按縣分類的當前許可:
查看下表中當前的第五章文件:
Asbestos
石棉
415 749-4762 asbestosjobs@baaqmd.gov
Engineering
一般工程資訊
415.749.4990 permits@baaqmd.gov
合規和執行
Underground Tanks
415 749.4999
Last Updated: 2026/7/27